![]() |
![]() |
|
|
|
|
|
|
|
| Harry Jay Gantt
(1891-1944) |
Harry Jay Gantt 1 2 3 4 5 6 7 8 9 10
Find a Grave Memorial 45351746
• Birth Image: 3 June 1891, in Grove Township, Adair, IA. 4 • He appeared on the 1895 Iowa State Census in Grove Township, Adair, IA on January 1895. 6 • He appeared on the 1900 US Census in Grove Township, Adair, IA on 1 June 1900. 7 • He appeared on the 1910 US Census in Lee Township, Adair County, IA on 19 April 1910. 9 • He appeared on the 1910 US Census in Grove Township, Adair, IA on 26 April 1910. 8 • His occupation on 5 June 1917 was a Farmer in Adair County, IA. 11 • On 5 June 1917, he registered for the World War I Draft at Grove Township, Adair, IA. • He appeared on the 1920 US Census in Walnut Township, Adair County, IA on 17 February 1920. 2 • He appeared on the 1930 US Census in Grove Township, Adair, IA on 23 April 1930. 3 • He resided at on 27 April 1942 in Stuart, IA. • Harry Jay Gantt registered for WW II Draft: 27 April 1942, Stuart, IA.
• Grave Image: After 31 January 1944, in Greenfield Cemetery, Greenfield, IA. 10 Harry married Valda Marjorie Blair, daughter of Elmer Daniel Blair and Sarah Elizabeth Lents, on 7 May 1911 in Greenfield, IA.1 2 3 (Valda Marjorie Blair was born on 24 November 1891 in Fontanelle, IA,1 2 3 12 died in March 1977 in Greenfield, IA 12 and was buried in March 1977 in Greenfield Cemetery, Greenfield, IA 12.)
• Marriage Image: 7 May 1911, in Greenfield, IA. 1 • They appeared on the 1920 US Census in Walnut Township, Adair County, IA on 17 February 1920. 2 • They appeared on the 1930 US Census in Grove Township, Adair, IA on 23 April 1930. 3
|
1 "Iowa, County Marriages, 1838-1934," database, FamilySearch (https://familysearch.org/search/collection/1805551 : accessed 23 May 2020), Harry Gantt and Valda Blair, 07 May 1911, Greenfield, Adair, Iowa; citing reference P 401, county courthouses, Iowa; FHL microfilm 1,787,404.
2 1920 U.S. census, population schedule, Walnut Township, Adair County, Iowa, United States, enumeration district (ED) 17, sheet 5B, family 106, Harry Jay Gantt and Valda Marjorie Blair; index and images (accessed 24 May 2020); citing National Archives and Records Administration microfilm T625, roll 476.
3 1930 U.S. census, population schedule, Grove Township, Adair County, Iowa, United States, enumeration district (ED) 8, sheet 4B, family 81, Harry Jay Gantt and Valda Marjorie Blair; index and images, FamilySearch.org (accessed 24 May 2020); citing National Archives and Records Administration microfilm T626, roll 640.
4 "Iowa, County Births, 1880-1935," database, FamilySearch (https://familysearch.org/search/collection/1821206 : accessed 24 May 2020), Harry Jay Gantt, 3 Jun 1891; citing Iowa, United States; county district courts, Iowa; FHL microfilm 1,787,719.
5 "United States World War II Draft Registration Cards, 1942," database with images, FamilySearch (https://familysearch.org/search/collection/1861144 : accessed 24 May 2020); Harry J Gantt, 27 Apr 1942; citing NARA microfilm publication M1936, M1937, M1939, M1951, M1962, M1964, M1986, M2090, and M2097 (Washington D.C.: National Archives and Records Administration, n.d.).
6 1895 Iowa State Census, Grove Township, Adair County, Iowa, United States, p. 204, family 86, line 17, T. J. Cunningham and Frances Holmes; database with images, FamilySearch (https://familysearch.org/search/collection/1803957 : accessed 17 May 2020).
7 1900 U.S. census, population schedule, Grove Township, Adair County, Iowa, United States, enumeration district (ED) 6, sheet 1A, family 8, Frances Holmes; index and images, FamilySearch.org (accessed 17 May 2020); citing National Archives and Records Administration microfilm T623.
8 1910 U.S. census, population schedule, Grove Township, Adair County, Iowa, United States, enumeration district (ED) 6, sheet 6A, family 114, William Wesley Dwigans and Frances Holmes; index and images, FamilySearch.org (accessed 18 May 2020); citing National Archives and Records Administration microfilm T624, roll 390.
9 1910 U.S. census, population schedule, Lee Township, Adair County, Iowa, United States, enumeration district (ED) 10, sheet 2B, family 50, Henry Richard Johnson and Amy Frances Gantt; index and images, FamilySearch.org (accessed 19 May 2020); citing National Archives and Records Administration microfilm T624, roll 390.
10 Find A Grave, database and images (https://www.findagrave.com/ ); accessed 24 May 2020, memorial page for Harry Jay Gantt (1891-1944), Find a Grave Memorial no. 45351746, citing Greenfield Cemetery, Greenfield, Adair County, Iowa, USA
11 "United States World War I Draft Registration Cards, 1917-1918," database with images, FamilySearch.org (accessed 24 February 2021); Harry J Gantt, 1917-1918.
12
Find A Grave, database and images (https://www.findagrave.com/ ); accessed 24 May 2020, memorial page for Valda May Blair Gantt Havens (24 Nov 1891-Mar 1977), Find a Grave Memorial no. 45351743, citing Greenfield Cemetery, Greenfield, Adair County, Iowa, USA
Home | Table of Contents | Surnames | Name List
This website was created 14 March 2025 with Legacy 10.0, a division of MyHeritage.com; content copyrighted and maintained by brian@the-lightfoots.com